The Student Dormitory and Subordinate Buildings (Rongyuan Building E) Project was Officially Put into Implementation

Release Time:2021-05-20 Author:Li Qing Editor:Xu Zhiyuan

All the formalities of and preparations for the student dormitory and subordinate building (Rongyuan E Building) project of our school has been completed before construction, which officially started recently. The project is undertaken by Sichuan Sixth Construction Co., Ltd., with a construction period of 500 days and is expected to be put into use in the autumn semester of 2022.

The student dormitory and subordiante building (Rongyuan Building E) project entails a total land area of about 7,673.24 square meters and a total construction area of about 35,998.08 square meters. There are 15 floors on the ground, with a height of 3.3m, a building height of 49.95m, and one underground floor with a height of 4.2m. The building adopts independent foundation, pile foundation and strip foundation, and the main structure is shear wall structure, including fabricated building construction with assembly rate of about 50%.

Address: No. 20, East University town road, Shapingba district, Chongqing.     Postcode: 401331

Information Management: Publicity Department of Party Committee of CQUST. Technical Support:Information Technology  Office  of CQUST.

Copyright: Chongqing University of Science and Technology. ICP 13000511-1